New · CEE Gen 12 →

Zero Liquid Discharge for industry

Recover your water. End your discharge liability.

Zero Liquid Discharge (ZLD) means no wastewater leaves your site as a liquid. You can buy the system, or have us run it and pay only per m³ treated.

Latest

CEE Gen 12: five times the evaporation of its predecessor, in one module.

See Gen 12 →Follow us on LinkedIn →

How it works

Wastewater in. Water recovered. Only a small residue out.

Batch RO recovers the water. CEE evaporation concentrates what is left, so only a small final residue needs disposal. Each stage can also be bought on its own.

HyBatch RO unit
Stage 1 · Membrane

HyBatch RO

Batch reverse osmosis recovers the water from difficult wastewater.

  • up to 97% peak water recovery, some effluents
  • 1.845 kWh/m³ measured energy
  • 30–55% less energy than conventional RO
How HyBatch RO works →
CEE Gen 12 evaporation module
New · Gen 12Stage 2 · Thermal

CEE evaporation

Concentrates what HyBatch RO leaves behind, in a module instead of a pond.

  • ≈7.3 m³/day evaporated per Gen 12 module
  • 6–20 kWh/m³ electricity, no heat input
  • 5.6× the capacity of Gen 9
See CEE Gen 12 →
Output

Final residue

Zero liquid discharge

The only part that leaves for disposal. Nothing leaves your site as a liquid.

Why the split mattersRemoving water with a membrane costs a few kWh/m³. Removing it with heat costs tens. The membrane works up to its ceiling, and evaporation only finishes what is left. Together the two stages are RealZLD, our integrated system.

How you get it

Buy the system, or pay per m³ treated. You choose.

Both options use the same technology. The choice depends on your capital, your team and your risk appetite.

Option A

Buy the equipment

We supply, install and commission the system. Operation and maintenance contracts are available.

  • You own the asset.
  • HyBatch RO, CEE, or the complete train.
  • A fixed project cost.
Option B

Pay per m³ treated

We supply, install, operate and maintain. You pay a rate for each m³ treated.

  • No upfront investment.
  • A variable cost that follows your real volume.
  • Performance committed by contract.

1. Send us an analysis

A recent effluent analysis and the daily flow.

2. Sizing and validation

The split between stages, and tests with your real water.

3. Your offer

A project price, or a rate per m³, with performance committed by contract.

Strategic partner

Seinec

Seinec is our strategic partner. Their partnership gives Wise Water Solutions added financial credibility. In Spain and Morocco we deploy together.

Proof

Numbers from operating equipment.

<10 kWh/m³
energy for the complete train
Compared with 30–60 kWh/m³ to evaporate the whole effluent.
97%
peak water recovery in HyBatch RO, with some effluents
90% validated on real metallurgical effluent. Conventional RO: 70–80%.
12×
less specific energy than MEE + ATFD
Integrated HyBatch RO and CEE system, from liquid to final residue.
>25
units installed
Present in Spain, the UK, the USA, Morocco, India and Chile.

Reference projects

In continuous operation for reference clients.

Bosch

Industrial effluent, India. HyBatch + CEE.

Zero liquid discharge12 months in operation

Honda

Motorcycle & Scooter India. HyBatch + CEE.

Zero liquid discharge8 months in operation

SUEZ

Municipal water reuse. HyBatch.

20% less energy, fewer reagents15 months in operation

Topdental

Process water, Yorkshire, UK. HyBatch.

35% lower cost, no softeners17 months in operation

Sectors

Where we change the economics of water.

From 25 to 1,000 m³/day per installation.

Landfill leachateDigestateIndustry and miningBrines and RO rejectUltrapure waterPharmaceuticalMunicipal reuseFood and beverage

Sector detail →

News

Latest from Wise Water Solutions.

Latest LinkedIn postFollow us on LinkedIn →
Our latest updates are on LinkedIn.Product launches, projects and events.Open our LinkedIn page
Product launch

CEE Gen 12: five times the evaporation in one module

Our new baseline module evaporates ≈7.3 m³/day at ambient conditions, with no pre-heating.

Read the specifications →
To addMore news items go here. Copy the block above for each one. Delete this box when done.

Contact

Talk to an engineer.

Tell us what you discharge today. Include volumes and a recent analysis if you have one.